Waterfall Methodology: Technology Solution Governance Compliance Process
Process Owner: Manager, Solutions Development and Support
Note: An owner must be a PCES-level manager or higher.
This process establishes standard tools and processes for the TSLC Waterfall Governance Compliance phase within the Postal Service Technical Environment.
The Governance Compliance process will be followed for the technology solution and includes, but is not limited to:
All technology solutions and their components (hardware, software, database, and/or network), as authorized in the Technology Solution Requirements with Approval document.
All services (including network, server, and mainframe) to be deployed in the Postal Service Technology Environment.
All Database Management Systems (DBMS) being developed to operate in the Postal Service Technology Environment.
All maintenance releases for services and technology solutions that operate in the Postal Service Technology Environment. Maintenance releases include hardware, software, network, and DBMS upgrades.
The Technology Solution Governance Compliance process, which validates that the required documents are up-to-date and stored in the archive, consists of the following sub-processes:
| 1. | Ensure that all of the applicable artifacts from all of the previous phases have completed correctly and uploaded to the appropriate location in the TSLC Artifacts Library. |
a. Initiate and Plan Phase Artifacts
- Business Needs Statement
- Change Control Board Document*
- Cost Matrix for Completing Requirements and Design
- Documented Approval and Funding to Proceed
- Initial Project Plan
- ROM Estimate
- EIR registration verification
- Documented Approval and Funding to Process
b. Requirements Phase Artifacts
- Business Impact Assessment
- Traceability Test Matrix
- EA Checkpoint 1 Approval
- Technology Solution Requirements with Approval*
c. Analysis & Design Artifacts
- Risk Assessment
- Technology Solution Design with Approval
- Technology Solution Security Control Plan
- EA Checkpoint 2 Approval
- Updated Traceability Test Matrix
- Draft SIT Strategy
- Draft CAT Strategy
- SOX Impact Assessment Form*
- Technology Solution Implementation Costs
- Updated Project Plan
- TS Funding and Schedule Approval
d. Build Artifacts
- SIT Scripts*
- Build Plan
- Site Security Review
- TS Environment Build
- Final Code and Build Package
- Updated Traceability Matrix
- System Documentation
- Systems Integrations Testing (SIT)
- SIT Plan
- SIT Readiness Plan
- Updated Traceability Test Matrix
- SIT Test Results*
- Final SIT Strategy
- SIT Documented Approval*
- Security Code Review Report
- Security Test Results
e. Customer Acceptance Testing (CAT) Artifacts
- CAT Plan
- CAT Readiness Plan
- CAT Scripts*
- Updated Traceability Test Matrix
- Final CAT Strategy
- C&A Risk Acceptance Letter
- Security Certification Letter
- Security Accreditation Letter
- Customer Acceptance Approval*
- CAT Results*
Note: Baseline artifacts are mandatory and must be uploaded. Baseline artifacts are indicated in this document by an asterisk (*).

An asterisk (*) denotes a Baseline requirement.
Inputs
Outputs
An asterisk (*) denotes a Baseline requirement.

An asterisk (*) denotes a Baseline requirement.
Business Project Lead (BPL): Responsible for ensuring that all artifacts are completed and uploaded to the appropriate locations in the TSLC Artifact Library.