Skip Top Navigation
  • Who We Are

    • Leadership
    • Financials
    • Government Relations
    • Judicial Officer
    • Legal
    • Our History
    • Postal Facts
  • What We're Doing

    • Strategic Planning
    • Current Initiatives
    • Securing The Mail
    • Sustainability
    • Corporate Social Responsibility
    • Government Services
    • Postal Customer Council
    • Service Performance Results
  • Newsroom

    • National News
    • Local News
    • Testimony & Speeches
    • Broadcast Downloads
    • Events Calendar
    • Photo Gallery
    • Service Alerts
  • Careers

    • Career Opportunities
    • Working at USPS
    • How to Apply
    • Profile Login
  • Doing Business with Us

    • Suppliers
    • Licensing
    • Rights & Permissions
    • Auctions
    • Public Key Infrastructure
The image is the profile of an eagle's head adjoining the words United States Postal Service to form the corporate signature, along with the text About
Link to "8-1.18 Liquidated Damages" Link to contents for "8 USPS Supplying Practices Commodity Specific"      Link to "8-1.20 Performance of Work by Supplier"

8-1.19 Base and Alternate Prices

RFPs permitting alternate proposals must require the base proposal to include all features considered essential to a sound and adequate building design. Any alternates to be included in the specifications should represent significant amounts of work in relation to the base proposal, and they should generally be structured as “add” or “deduct” alternates. When accurate cost estimates are not available, a base proposal may be required for the minimum acceptable project, with “add” alternates for desired materials or equipment. When budget constraints exist, a base proposal may be required for the plans and specifications as stated, with “deduct” alternates for desired materials or equipment to be used to bring proposals back within budget. RFP documents calling for alternates must clearly state that the Postal Service reserves the right to accept or reject any and all alternate prices, as may be determined by the CO to be in the Postal Service’s interests.




Link to "8-1.18 Liquidated Damages" Link to contents for "8 USPS Supplying Practices Commodity Specific"      Link to "8-1.20 Performance of Work by Supplier"
  • LEGAL

    • Privacy Policy ›
    • Terms of Use ›
    • FOIA ›
    • No FEAR Act EEO Data ›
  • ON ABOUT.USPS.COM

    • Newsroom ›
    • USPS Service Alerts ›
    • Forms & Publications ›
    • Careers ›
    • Site Index ›
  • ON USPS.COM

    • USPS.com Home ›
    • Buy Stamps & Shop ›
    • Print a Label with Postage ›
    • Customer Service ›
    • Delivering Solutions to the Last Mile ›
  • OTHER USPS SITES

    • Business Customer Gateway ›
    • Postal Inspectors ›
    • Inspector General ›
    • Postal Explorer ›
Copyright© 2025 USPS. All Rights Reserved.