The example below explains the process and calculation of assessments for Nesting/Sortation (MPE) errors. The mailer in the scenario only exceeds the monthly error threshold for Nesting/Sortation (MPE) errors.
Table C-4.3a
Assessment Calculation Example Parameters
Example Mailer eDoc:
Category
Example Parameters
Total Seamless Acceptance pieces in eDoc
113,110
# of Nesting/Sorting Error Pieces
4,580
eDoc Mail Profile
First-Class Letters, under 1 oz., Automation
eDoc Piece Rate
$0.321
Corrected rate
$ 0.423
Table C-4.3b
Assessment Calculation Example Results
Monthly Seamless Acceptance Verification Results:
Error Level
Error Type
# of Errors
# eDoc Seamless Acceptance Pieces
Error Percentage
Error Threshold
Errors Above Error Threshold
Pieces
Nesting/Sorting
4.05%
1.00%
3,448
The process to calculate Nesting/Sortation (MPE) error verification results and assessments is below:
Nesting/Sortation Error Percentage
=
# of Seamless Acceptance Pieces with Nesting/Sortation Errors
# of Seamless Acceptance Pieces Submitted in eDoc
4580 Pieces
113,110 Pieces
Pieces Above Error Threshold
# of Seamless Acceptance Pieces with Nesting and Sorting Errors in eDoc
-
(
Total # of Seamless Acceptance Pieces Submitted in eDoc
x
Error Threshold Percentage
)
4,580 Pieces
( 113,110 Pieces x .01 )
3,448 Pieces
Additional Postage Due
# of Pieces Above Error Threshold
X
Correct Piece Rate
($0.423 - $0.321)
$351.70